West Construction acted as the main contractor for this four-month project for Titoki Park Developments worth $740,000. The development was located at the old Melville rugby ground known as Stan Heather Park which has been turned into a residential area.

The works included:

  • Approx. 1440 l/m of 150 uPVC potable water reticulation.
  • Hydrant, Valve and hose connections.
  • Connection to existing HCC water main.
  • 290 l/m of Roading construction.
  • Earthworks volumes: 670lm of Roading; 3900m3 cut to certified fill

To view the plans click the links below:

Titoki Park – page 1

Titoki Park – page 2

Titoki Park – page 3

If you are planning subdivision development or you require the services of a high-quality civil contractor in Hamilton or throughout the Waikato, get in touch with West Construction to discuss your requirements.

Share on facebook
Facebook
Share on google
Google+
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on email
Email

TALK TO US ABOUT